NMCI Project Assessment

The undermentioned is my assessment of the projectThat when developing the project care was never taken to ascertain carefully the set objectives and whether or not they were organism met. As a result only two of them were met which indicated there was a necessity to overhaul the formation. None the less expansion continued as if zipper was wrong.Modern development tools like prototyping were never practice sessiond suitablely. formation users were never knobbed in the development as the project was only handled by the experts. As a result serious mistakes were never detected let completely being solved in time. The size of the project needed the use of modern networking hardware, fast enough to cope with the heavy traffic created by the over 650,000 users. Instead of replacing the obsolete old hardware with the sensitive ones the project continued to build on them which created more disaster.The monitoring appendage was never put into use as the Navy personnel who appea red to hire vested interest in the project kept on defending it quite a than bringing correcting and useful comments during the development process. They only focused on being able to provide some service whether that service was reliable or dependable was never the issue was never an issue. The Navy ashes is commonly classified as critical and needs special methods to minimize and run some faults during its development. Such methods were never used. For example reliability, safety and security assessments were never done. Performance tests were never carried even though it was clearly known much(prenominal) tests were mandatory. The programming languages used were never compatible with modern distributed direct systems. in that location was need to use Object Oriented corpses to enhance later passing compatibilityTHE AFI NEW SYSTEM PROPOSALIntroductionPurpose of the archiveThis document is prepared for use by the interest people and for the following purposesUser Name W hy need the Document System Customers Check if needs are met and specify any changes that may be required Managers/ Officers To plan for the system bid and its development System Engineers To Know and be guided on what system to develop System test engineers To develop validation tests System Maintenance Engineers To understand the system parts and its totality Scope of the ProductThis system is meant to be used by the current air force staff and it leave take into visor their current number and the projected number in the year 2030..It exit use the most current network technology including their topologies, transmission media, and distributed operating system architecture.System OverviewWhy use networksTo entirelyow for efficient sharing and use of calculator resourcesTo facilitate efficient dissemination of messages, notices to air force staffTo provide connectivity to early(a) armed forces and air force personnel in USTo research and read widely about events taking place i n US, and outside world. In particular those that are a threat to the USTo perform trade and other(a) commercial activitiesThe connectivity and expected workloadEthernet products will be used due to its simple mindedness and widespread useFiber optics cables will provide major connectivityWireless hone technology will be usedExpected Achievements and FailuresAll the cited failures in the NMCI project will be avoided, specificallyThe integrate system life cycle will be used which is proper fact finding, system design, system implementation through prototyping, system consolidation and testing system parallel operation, evaluation and maintenance.User involvement at all levels of system developmentUser training through in house training programs seminars and store attendanceSystem ConstraintsThe major constraint will be lack of awareness on the part of users . Computer technology is changing very rapidly and the memorial tablet will be properly informed and well prepared to inc lude such changes as inevitable.Methods and ProceduresNetwork Models UsedSystem Anticipated EvolutionsRecommendationsConclusionsReferencesInternet as given from NMCI system namelyhttp//www.gao.gov/new.items/d0751.pdf http//www.govexec.com/dailyfed/1206/120806ts1.htm http//www.eds.com/news/news.asp?news_id=2905 Ian Summerville Software Engineering

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.